115kV / 69kV Lattice Tower Relocation

Maple Leaf Power completes 115kV / 69kV tower relocation, reconductor, and salvage. Construction of double circuit monopole replacement line and salvage of 3 kilometers of double circuit 115kV conductor and lattice towers in Winnipeg, Manitoba for Mastec/Manitoba Hydro.

  • Transmission Construction

  • Transmission Maintenance

  • Tranmission Reconductoring

  • Grillage Installation

  • Right-of-Way Mat Installation

  • Lattice Tower Salvage

  • Monopole Construction

  • Implodes

  • Project Management

  • Cost Controlling